TEST AND THROUGH EXAMINATION REPORT (4909)

Date of Inspection: February 13, 2026

Test Due Date: August 12, 2026

Name of Company: CUBIC Engineering Co.

Certification No: ATC-LFT-4909

Device Name: Type of equipment: Carbon steel shaft,ID No.: 077,Load Test (for shaft): 16 Ton SWL: 16 Ton Dimension of Shaft (L x Dia): 2.03 M, 50 mm,Found ok at the time of inspection. (Acceptable)

Scroll to Top